Industry: Waste to energy plant

Waste to energy plant AEM Gestioni

Feasibility study

Feasibility study for replacement of the existing system to feed medical wastes on Waste to energy plant in Cremona. Owner AEM Gestioni Srl.

Expediting and vendor compliance of boiler

The GPC Gruppo Public Consult Spa committed to  W.T.E. the  expediting and the vendor compliance audit during the manufacturing of a  steam boiler of 20 tons/hour to be installed on the third line of the waste to energy plant sited in Schio (Italy).

Consulting on failure

Consulting on untimely collapse of furnace roof occurred on the waste to energy plant managed by ACCAM sited in Busto Arsizio (Varese)

Engineering services

CON.SER.VCO, the owner  of the incineration plant sited in Mergozzo (VCO), needed a detailed report on the actual state of the refractory lining in the furnaces. W.T.E. delivered an objective analysis about the conditions of furnace walls and some suggestions concerning maintenance and  refurbishment costs .  

engineering storm water tanks Silla 2-Milan

Design and supply water treatment

W.T.E.  designed, engineered and delivered the system for collection and separation of rain water system to be installed on the waste to energy  plant  SILLA II, owned by AMSA SpA in Milano. The new design considered a passive system for separation of first rain water to be collected in a dedicated tank. The new system …

Design and supply water treatment Read More »

refractory laying

Expediting and vendor compliance of refractory

GPC Gruppo Public Consult Spa committed to  W.T.E. the  expediting and the vendor compliance audit during the refractory laying  of furnace installed in third line of waste to energy plant located in Schio (Italy).