Industry: Waste to energy plant

construction supervision

Consulting about boiler malfunctioning failures

An Italian Joint venture delivered an ORC energy recovery system in the revamping project of an existing  waste incineration plant. Some major problems were recorded after the start up. W.T.E. was required to evaluate the solution proposed by JV in order to avoid litigation with their Client.      

Feasibility study and bid docs for RDF cogeneration plant

After an international public call for tender issued by Ventspils (LV) Authority, W.T.E. had assigned the job with the title: “Development of a construction design (…) and technical specifications for the procurement of design, construction and supply of equipment within the boundaries of the project titled “Installation and Operation of a Refuse-Derived Fuel Regeneration Plant …

Feasibility study and bid docs for RDF cogeneration plant Read More »

gas cleaning system of a WTE plant

Design and basic engineering

The client, owner of the wte plant Silla2 in Milan, appointed W.T.E. to provide a solution for the treatment of the primary air, drawn from the refuse pit of the plant. WTE designed a system in two stages. A self-cleaning filter, operating as metallic sieves, was recommended. As the plant needed a deeper cleaning system …

Design and basic engineering Read More »

Engineering for de-commissioning

Expertise on dismantlement and decommissioning of a 2500 t/d waste sorting plant. W.T.E. has been appointed by A2A-AMSA to study the decommissioning of the waste selection plant installed intne proximity of the wte plant of Milan, from technical and economical point of view.

Consulting about malfunctioning

Terni Biomassa Srl commissioned the analysis of the combustion process to W.T.E. in order to verify the capacity of the boiler fed by RDF.

Consulting on operational procedures

W.T.E. updated all operational procedures, start-up, emergency shutdown procedures, etc. for each section of the Geofor Spa Incineration plant -Ospedaletto (Pisa).