General Consultant-Engineering of complete waste treatment system

waste to energy plant

The ORTOLAN Srl company gave to W.T.E. the role of general consultant for the engineering to  present a complete project for urban waste management  to the public authorities in Ankara (Turkey)

The project included:  300.000 tons/year MSW incineration plant (3 x 52 MWt lines, complete with T/G, dry and wet APC system, auxiliary landfill for hazardous/toxic waste)
Cost estimates / Financial model

CLIENT

ORTOLAN Srl

LOCATION

Codognè (TV)

COUNTRY

Italy

YEAR

2000

INDUSTRY

Waste to energy plant

OBJECT

Complete System

ACTIVITY

Feasibility Study

ASSIGNMENTS

Feasibility Study