Feasibility study and bid docs for RDF cogeneration plant

After an international public call for tender issued by Ventspils (LV) Authority, W.T.E. had assigned the job with the title:

"Development of a construction design (…) and technical specifications for the procurement of design, construction and supply of equipment within the boundaries of the project titled "Installation and Operation of a Refuse-Derived Fuel Regeneration Plant at 69 Talsu Street, Ventspils"".

”No atkritumiem iegūtā kurināmā reģenerācijas iekārtu  izbūve Ventspilī, Talsu ielā 69”

The assigned job regarded a 10 MWth RDF furnace  co-generative plant, providing  thermal energy to local district heating and electric energy to the national grid. WTE delivered the Process Flow Diagram of the feeding system, of the furnace and the boiler, of the multi stage gas cleaning system and of the thermal cycle .

W.T.E. carried out a sensitivity analysis on the plant's Net Present Value pertaining to energy price fluctuations. Moreover, preliminary equipment dimensioning, layout and sectional drawings, specifications and data sheets for all plant components and bid documents has been delivered.

A preliminary budget price in both hypothesis, shopping around and EPC, has been evaluated.

Due to a request of budget adjustment, the whole study had also been delivered for 8.5 MWth furnace capacity.

CLIENT

V.L.K. SIA

LOCATION

Ventspils

COUNTRY

Latvia

YEAR

2018

INDUSTRY

Waste to energy plant

OBJECT

Complete System

ACTIVITY

Feasibility StudyProcurement services

ASSIGNMENTS

Feasibility Study
Permitting support: Engineering
Procurement: Support