Design and basic engineering

gas cleaning system of a WTE plant

The client, owner of the wte plant Silla2 in Milan, appointed W.T.E. to provide a solution for the treatment of the primary air, drawn from the refuse pit of the plant.

WTE designed a system in two stages.

A self-cleaning filter, operating as metallic sieves, was recommended. As the plant needed a deeper cleaning system a special bag house as second stage was dimensioned and recommended.

CLIENT

A2A Ambiente SpA

LOCATION

Brescia

COUNTRY

Italy

YEAR

2016

INDUSTRY

Waste to energy plant

OBJECT

Flue Gas Cleaning System

ACTIVITY

Engineering

ASSIGNMENTS

Basic Engineering