Object: Complete System

consulting engineering

Consulting about malfunctioning of the EfW plant

Consulting – on a continuous basis – on few critical items in the management and performances of the MSW incineration plant, located in Vercelli and  operated by Termomeccanica Group on behalf of the municipal company ATENA, the owner.

Consulting on failure

Consulting on untimely collapse of furnace roof occurred on the waste to energy plant managed by ACCAM sited in Busto Arsizio (Varese)

Offer engineering

Daneco Impianti SpA ordered to W.T.E. the engineering for offer related to a project of a new waste to energy plant to be realised in Messina(Sicily). The plant would process 430.000 tons per year of municipal solid waste by three lines of 62.5MWth-53 MWe. W.T.E. delivered basic engineering, all technical specifications, metric calculations of main …

Offer engineering Read More »

Structural engineering of gravel silos installed in a pit.

W.T.E. developed the structural engineering of the  silos to be erected in a gravel pit. During the construction serious structural faults arised and W.T.E. was appointed to verify calculation and carry out the remediation project in order to reinforce  the load-bearing structure. Final client  Cava ARMATI- Sovere (BG)

lay out piping

Engineering of a new Al smelting process

Development of a new Aluminum smelting process. Process design including mass and energy balances, P&I and general layout of the system, dimensioning of the major components of the system.