Object: Flue Gas Cleaning System

Flue gas cleaning system dimensioning

Basic engineering

W.T.E. studied and delivered to Hascon Engineering the dimensioning of a spray dryer and technical specifications of washing towers to be provided to foreign client.

mascioni site

CHPP 50MWth from coal to biomass with 15MWe new thermal cycle. Feasibility study

Mascioni S.p.A. (Cuvio-VA), an important Italian yarn-dyeing factory, appointed W.T.E. to design and engineer the way to substitute coal for PKS (Palm Kernel Shell) and dried sewage sludge in its 50 MWth boiler. The boiler had to deliver superheated steam (455 °C e 64 bar) to a co-generative thermal cycle, including a new full condensing …

CHPP 50MWth from coal to biomass with 15MWe new thermal cycle. Feasibility study Read More »

waste to energy plant Fusina

Consulting

Engineering service assistance for a MSW incineration plant in Fusina

gypsum slurry divertere for coal power plant

Engineering and supply

ALSTOM Power Italia ordered to W.T.E. the engineering,  the construction and delivering  of a second gypsum slurry diverter for a desulphuration system installed on the Power plant “Centrale Thermique de Provence”, fed by coal, located in Meyreuil, France

prefeasibility study

Feasibility study

Development of an innovative system to control exhaust flue gas temperature and replacement of the existing lime milk gas reactor with a dry sodium bicarbonate reactor.

consulting engineering

Engineerig services: handbook editing

W.T.E. delivered engineering services for support ALSTOM in edition of the handbook of erection of new flue gas cleaning system of the wte plant in Parona Lomellina (PV).