Object: Thermal cycle

steam condenser on incineration plant

Feasibility study of new steam condenser

A.Am.P.S., owner of the incineration plant in Livorno, ordered to W.T.E to develop the technical feasibility study of theremoval of the existing steam condenser and of the erection of the new one with improved performances.

piping of thermal cycle

Feasibility study

Troubleshooting and availability improvement  of the thermal cycle installed on incineration plant owned by A.AM.P.S. in Livorno (turbogenerator 6.7 MWe gross). Following this study W.T.E. received the order to carry out the revamping of thermal cycle and auxiliaries.

consulting engineering

Feasibility study: integration of a 3 x 61 MWt MSW incineration plant with a combined turbogas cycle

Technical and economical viability of the integration of a 3 x 61 MWt MSW incineration plant with a turbogas cycle. The study of the impact on generation performances was developed by the analysis of 24 different operational functioning, related to weather conditions during the year. Main data of boiler and condenser  performances were described by …

Feasibility study: integration of a 3 x 61 MWt MSW incineration plant with a combined turbogas cycle Read More »