Design and supply for revamping of gas cleaning system in a wte plant

SCR reactor on incineration plant

After a public tender W.T.E. obtained the contract for a major revamping of the MSW incineration facility. The plant was owned by AEM Gestioni Srl – Cremona, now a partner of A2A.

The object of the tender was design, supply, install and start-up of:

- high Dust SCR DeNOx unit, installed downstream of an exixting SNCR system

- insertion of a second boiler downstream first, in order to control rough gas temperature,

- replacement of semidry lime absorber system with dry sodium bicarbonate, including mills and dosing system,

- insertion of a gas-water economizer connected to the district heating network in order to optimize energy efficiency.

 

 

CLIENT

AEM Gestioni Srl

LOCATION

Cremona

COUNTRY

Italy

YEAR

2011

INDUSTRY

Waste to energy plant

OBJECT

Complete System, Flue Gas Cleaning System

ACTIVITY

Design & Supply

ASSIGNMENTS

Design & Supply
Refurbishment/Upgrade
Commissioning & Startup