Industry: Solar system

Engineering and permitting services

Fichtner Italia Spa commissioned W.T.E. the support engineering  and the technical specifications for equipment to be installed in two integrated solar – biomass thermoelectric plants CSP, in Gela -Sicily (12 MWe) and in S.Quirico- Sardinia (10.8 MWe). WTE has elaborated functional specifications with design requirements related to the characteristics of biomass, Power block, BoP.  

low-temperature econimiser

Consulting

ECOSESTO Spa requested W.T.E. to give technical consulting concerning the calculation of feed in tariff after the start-up of the solar plant installed as an auxiliary sytem  of the thermal cycle on the biomass plant in Rende (Calabria).