Pre-feasibility study of chemical plant upgrading
Conceptual study of the possible expansion and upgrading of a chemical plant.
Conceptual study of the possible expansion and upgrading of a chemical plant.
W.T.E. delivered basic and detailed engineering to upgrade an existing biomass boiler with 57 MWt at MCR and to build a new thermal cycle with a turbo-generator 14.5 MWe capacity. The project included also the revamping engineering of the existing boiler with the installation of a new superheater, able to deliver higher steam temperature, the …
Repowering of biomass boiler in a chemical factory. Read More »
Redecam Group Spa and W.T.E. signed an agreement concerning the provision of engineering services, precisely of the process engineering and technical consulting in the field of gas cleaning system (Sodium-bicarbonate Dry Flue Gas Cleaning System)
W.T.E. provided engineering services to Redecam Group in the project of a new Flue Gas Cleaning System – dry type
WTE has been in charge to develop technical documents in order to get the authorisation from Public Authority to use of a diathermic oil / steam boilers systems. The aim was to assure the compliance of the characteristics of existing components with parameters defined by law. SATTA & BOTTELLI, sited in the neirbourough of Milan, …
Silvateam Group is an Italian holding, world leader in the production of plant base extracts, since 1854. The job assigned included the study of biomass boiler revamping to improve steam characteristics and combustion, a new thermal cycle, a new gas cleaning system and a new biomass drying system.
Engineering services to receive GSE approval of the project related to a new cogenerative biomass to energy plant with of capacity 2.4 MWe . The plant would have been fed with residues of wood treatment produced in the main industrial process owned by Florian Legno Spa
In almost twenty years of activity, W.T.E. delivered on many occasions spare parts for combustion grate (bars) to ALPI SPA one of the most important Italian wood industries located in Modigliana (FC).
ABET Laminati SpA had high energy consumption in the processes: through a third party (CRESM)they appointed W.T.E. to study the optimization of the existing combustion process and a new co-generative thermal cycle. The processed fuels are industrial by-products, very reach in ashes, which frequently plug furnace and boiler. W.T.E. delivered a feasibility study that concerned …
Feasibility study for energy recovery from industrial refuse Read More »