Industry: Biomass to Energy plant

Performance analysis

ECOSESTO Spa asked to W.T.E. to conduct an audit on energetic performance of the biomass to energy plant (16.5 MWe) operating in Rende(Calabria) in order to improve the energy efficiency of the plant. W.T.E.’ aim was to achieve the optimisation of combustion process through increased flexibility; the final aim was to allow the combustion of …

Performance analysis Read More »

Engineering service

Enhancement and Tuning Control Loops – The existing Combustion Control system was originally delivered by W.T.E. to Dister Energia for the biomass plant with 24 MWth of capacity operating in Faenza (FC).

Flue gas cleaning system dimensioning

Offer engineering

Carlo Gavazzi Impianti requested  W.T.E.  to deliver  engineering services in order to complete the documents for tender concerning the thermal cycle (27 MWe) and the flue gas cleaning system of a new biomass to energy plant. W.T.E.  calculated energy and mass balances both in-  and off-design and delivered Process Flow Diagrams.    

engineering for permitting

Engineering and permitting services

Luino Energia Srl commissioned several engineering activities to W.T.E. in order to receive permit for the erection of a biomass plant near the city of Luino. Main plant parameters: 100% MCR – 8.9 MWth – electric power at generator terminal 2.38 MWe. Scope of work included: – verifying the expected energy efficiency; – defining the …

Engineering and permitting services Read More »

construction supervision

Offer engineering

W.T.E. provided Carlo Gavazzi Impianti with  process engineering to draft offers for  new biomass plants in Macchiareddu, Russi, Casei Gerola , final client Enel Green Power . W.T.E. delivered engineering services for approx. 1000 h.