Pre-feasibility study of chemical plant upgrading
Conceptual study of the possible expansion and upgrading of a chemical plant.
Conceptual study of the possible expansion and upgrading of a chemical plant.
Silvateam Energia commissioned to W.T.E. to develop a preliminary design of a waste biomass cogeneration plant, which included fuel handling, combustion system, boiler, thermal cycle and auxiliaries. The plant should deliver electric energy to the grid and MP steam to industrial processes. The boiler should be fed by industrial residues such as bark and exhausted …
W.T.E. delivered preliminary engineering of a small scale Waste to Energy plant to be realised in a special urban context.
Feasibility study to convert a furnace, fed by diesel oil, to RDF (Refuse Derived Fuel), throughput 150 MWe W.T.E. designed a mathematical model based on characteristics of existing boiler and suitable to describe air suspended fuel burning and energy recovery in combustion chamber. Reduced steam thermodynamic parameters were assumed in order for the boiler tubes …
Feasibility study to convert furnace from oil to RDF. Read More »
The feasibility study elaborated by W.T.E. was commissioned by Ital Green Energy a Group Marseglia company with the purpose of receiving a preliminary description of a new cogeneration plant fed by a biomass mixture composed of olive-pomace and wood chips. The new plant would be positioned in the area of the holding in Monopoli (BA) …
Pre-feasibility study of the convertion of the combustion system installed on the incineration plant from owned by Veolia Servizi Ambientali Tecnitalia Spa in Gioia Tauro (RC). The existing fluid bed furnaces were fed with RDF and they would be transformed into moving grate furnaces fed with MSW. The capacity of the plant was 49 MWth. …
Prefeasibility of the conversion of 2 EfW furnaces from fluidized bed to moving grate Read More »
Preliminary feasibility study for revamping of an obsolete Biomass to Energy plant
Transforest Srl ordered to W.T.E. the preliminary technical report about a proposal of a 24 MWt biomass furnace to be submitted to Public authorities in order to receive the permit to build the plant. The plant should be mainly fed by green wood, wood scraps, but it is also designed to burn miscanthus.