Design of two HRSG on a waste to energy plant and control system

W.T.E. signed a contract with ATZWANGER AG for the design of two boilers (20 tons/hour steam, T=370 øC, p=36 bar), to be installed at the AAMPS Livorno incineration plant.

The contract included the expediting activity, the design of the combustion control system and the training of operators and management of the plant.

The boilers were designed in order to run 8000 h/y without stop.

CLIENT

ATZWANGER SPA

LOCATION

Bolzano

COUNTRY

Italy

YEAR

2007

INDUSTRY

Waste to energy plant

OBJECT

FurnaceBoiler

ACTIVITY

Basic & Detailed engineering

ASSIGNMENTS

Basic Engineering
Detailed Engineering