Engineering of the upgrading of wte plant to be fed by RDF

CSS combustion and cogeneration

W.T.E. carried out an engineering analysis of Fusina-Venezia incineration plant, originally designed to burn MSW and now to be fed by high LHV RDF.

W.T.E. has delivered furnace mass and energetic balances in all the characteristic points of combustion diagram, verifying the combustion parameters. W.T.E. has also designed the headers and nozzles of secondary air and gas recirculation.

The plant shall be repowered reaching 20 MWth of MCR.

 

 

 

CLIENT

EUROPOWER

LOCATION

Gallarate (VA)

COUNTRY

Italy

YEAR

2019

INDUSTRY

Waste to energy plant

OBJECT

Complete System

ACTIVITY

Engineering

ASSIGNMENTS

Basic Engineering
Refurbishment/Upgrade