Preliminary study: thermal cycle in a distillery

project thermal cycle 1MWe

Preliminary study of a new thermal cycle and steam turbine capacity 1MWe.

The distillery, D.E.T.A. located in Barberino Val d'Elsa, wanted to use its grapes residues and lees for energetic purposes.

CLIENT

Distilleria D.E.T.A. Srl

LOCATION

Barberino Val D'Elsa (FI)

COUNTRY

Italy

YEAR

2012

INDUSTRY

General industry

OBJECT

Thermal cycle

ACTIVITY

Engineering

ASSIGNMENTS

Pre-feasibility study
Consulting