Offer engineering

Daneco Impianti SpA ordered to W.T.E. the engineering for offer related to a project of a new waste to energy plant to be realised in Sassari (Sardinia).

The capacity of the plant would be 270.000 tons/year of municipal solid waste to be incinerated by two lines of 35 MWth-17 MWe.

W.T.E. delivered basic engineering, all technical specifications, metric calculations of main sections of plant (furnace-boiler, flue gas cleaning system, thermal cycle), drawings of parts and of assembly.

CLIENT

Daneco Impianti Spa

LOCATION

Milano

COUNTRY

Italy

YEAR

2002

INDUSTRY

Waste to energy plant

OBJECT

Complete System

ACTIVITY

Engineering

ASSIGNMENTS

Offer Engineering